At height REMOVAL OF EXISTING GROUTING AT HEIGHT

  • Duration Three weeks
  • Segment Civil engineering, Heavy industries, International contractors
  • Solution Rebar-saving demolition

The grouting of an existing rail construction at a height of 15 metres needed to be removed. But how? This request came to ADS from Tata Steel IJmuiden.

THE SOLUTION

With a hydrodemolition robot and unit, we succeeded in removing the grouting in this hard-to-reach place, so that VTG Beton could reapply it.

Arjan de Waard

Want to know more about this project?

Call me back