HENGELERBRIDGE GOOR Demolish a bridge deck and save the reinforcement with a 100% guarantee?

  • Duration Two weeks
  • Segment Civil engineering
  • Solution Treating waste water, Rebar-saving demolition

This bridge over the Twente Canal was in poor condition and required maintenance. Under no circumstances was the reinforcement present to be damaged or replaced.

 

THE SOLUTION

Due to the tight time frame, two robots were used at the same time. This ensured a high production speed and a demolition depth of up to approx. 100 mm¹ and made it possible to quickly start the concrete repair work on the bridge deck.