Damage free removal DAMAGE-FREE REMOVAL OF COLLAPSED MOORING FACILITY

  • Duration One week
  • Segment International contractors, Civil engineering
  • Solution Rebar-saving demolition

Full removal and reconstruction is not always a sustainable solution. Strukton International B.V. wanted to reuse the existing structure of a collapsed steel mooring facility in Antwerp to save materials, time and money.

THE SOLUTION

With a specially converted hydrodemolition robot, we cleared up the collapsed steel facility within one week. Subsequently, the main contractor was able to reapply concrete to the structure.

Hans van ‘t Geloof

Want to know more about this project?

Call me back